Write the RFP. Build the bid.

Manufacturers turn drawings and plant standards into an RFP every bidder can price. Integrators turn a customer’s specification into a quote they can defend, task by task.

For manufacturers issuing an RFP

Write the scope, define how the work will be accepted and give every bidder one pricing form. Altitude flags conflicting requirements and calls out assumptions before the RFP goes out.

Sample request for proposal Line 4 packaging upgrade

Scope of work

Add reject tracking to the conveyor and show rejected cases on the operator screen.

Acceptance test

Send a marked test case through the line. Confirm it reaches the reject lane and the screen counts it once.

Bidder pricing form
Work packagePrice basis
Conveyor controlsLump sum
Operator screensLump sum
On-site supportDaily rate

For integrators preparing a bid

Estimate PLC, robot and HMI work from the customer’s spec. Carry the hours, exclusions and alternates into the quote so you can show what the price covers.

Sample estimate · LS4-UPG-001, Rev A Line 4 packaging upgrade

Selected engineering tasks

184 h subtotal

  • PLC development76 h

    Conveyor sequencing, jam detection and reject tracking

  • Robot programming56 h

    Second pallet position and alternating station logic

  • HMI design52 h

    Four Perspective views and their navigation

Quoted separately · Mechanical equipment

View the source estimate

Questions teams ask first

Who is the RFP writer for?
Owners and manufacturers sending work out to integrators, and integrators helping an owner write one.
Does it use our own terms and documents?
Yes. Save your standing terms and documents with the RFP document type, and every RFP states and attaches them.

More ways teams use Altitude

See it on the work your team does every day

We'll walk through the workflows that matter most to your team, on the PLC, robot and HMI platforms you run, from review and troubleshooting to documents and migration.