Modernize Schneider PL7 programs

See what the old Modicon program controls before you replace it. Altitude traces the original logic and helps you check the result of Schneider’s PL7 conversion.

Schneider Electric
Vendor
Schneider Electric
Files
.fef
  1. 1 Export the PL7 application as .FEF
  2. 2 Run Schneider’s PL7 converter in Control Expert
  3. 3 Review the converted logic against the source with Altitude, then build it in Control Expert

Everything a PL7 file holds, in one conversation

Prepare a replacement project from the application export.

  • Trace variables and addresses across the original sections
  • Review converter warnings alongside the original logic and I/O drawings
  • Carry the converted Control Expert project on to Studio 5000, TIA Portal, TwinCAT 3, CODESYS, SEL RTAC, Do-more or Sysmac Studio with the translator
  • Check against industrial standards such as IEC 61131-3, ISA-88, ISA-95 and PackML, or your own

Requests engineers type every day

  • Which sections drive the transfer pump?
  • List the I/O mappings we need for the replacement PLC.

The work PL7 projects need most

See Altitude on your PL7 files

We'll walk through the requests that matter to your team on the platforms you run, from review and troubleshooting to documents and migration.